Find out how to apply for the Rain Ready Rebate to build a climate-resilient garden.
Make your home stormwater-ready and more climate-resilient by installing a rain garden, permeable paving or rainwater harvesting system in your yard. Find out how to apply for the Rain Ready Rebate from Green Venture in this casual discussion with successful rebate participants.
AGE GROUP: | Adults (18+) |
EVENT TYPE: | Hobbies |
TAGS: | Seedy Saturday | In Branch | Green Venture | Environment |
The first Hamilton Public Library building opened on September 16, 1890 by the Earl and Countess of Aberdeen on the north side of Main Street West. In 1913, a new main library opened. This building was replaced in 1980 by Central Library, at the current location on York Boulevard.
In 2010, Central Library re-opened after approximately 18 months of renovations. Central Library opened with a newly revitalized first floor, which includes a Community Living Room that takes advantage of natural light. The Ontario Library Association honoured Central in 2012 with an Architectural and Design Transformation award.